One year of Drift Diaries

September 12, 2012

The Drift Diary for 26 August 2012 marks the one-year anniversary of the very first Drift Diary!

Darren’s been talking for about The Drift a whole lot, and the latest diary includes an inset showing all 21 hours of Daz chatting compressed to 8 minutes.

Top Tips from the Drift Diaries!

With over 100 Drift Diaries covering the production, Daz has shortlisted the ones any budding Backyard Producers might find useful for when making their own movies…. Enjoy the laughter and tears (mostly tears) as Daz tells you like it is!

2nd edit of The Drift is complete

August 4, 2012

Post production continues to progress at a good pace. The second edit has been completed, which means the scripted story is put in place, and it’s time to get more creative with the next edit. Daz and Sue are discussing the story, and how the mood, characters and plot should develop, based on the material we captured. Daz will be getting input from other editors to get ideas of ways to chop it up, to achieve that pacing.

Daz has also edited in some temp-tracks for the score, using existing material. We have a few guys producing bits of score based on that direction.

The VFX gang is moving forward well. The virtual Deliverance is mostly built; next it will be textured (i.e. ‘painted’), and rigged (given moving parts).

They have also been building dozens of other ships to form the drift of derelict ships.

So! Lots is happening, and lots still to do.

The Drift Making-of Photos

July 21, 2012

The Drift Making-of Photos

Here’s photos taken during production of The Drift. [Read more]

The Drift Documentary Stills

July 21, 2012

The Drift Documentary Stills

Stills from documentary footage recorded while filming The Drift. [Read more]

Drift Production Gallery

March 7, 2012

Drift Production Gallery

Here’s some early screenshots from The Drift. [Read more]

Filming of The Drift has begun

March 1, 2012

Here’s a small selection of photos from the first weekend of filming of The Drift.

A progress update from Producer Daz “The shots are looking great. We have the makings of a FANTASTIC movie – thanks to the Drifters!”

The Drift on Siren FM

January 17, 2012

Gemma Lowe from Siren FM (Lincoln radio station) was on set at the weekend. Her 8-9 minute segment on The Drift will be aired today (17 January 2012), between 4pm and 5pm.

You can listen live in Lincolnshire, by tuning in to FM 107.3, or from anywhere on the internet, at http://www.sirenonline.co.uk/

We have a recording of the segment embedded below.

‘The Drift’ film – Feature part 1 by gemmaloweradio